Inland Empire Industrial Submetering

"NNN Compliance for Warehouses, Logistics & Manufacturing"

500,000+ SF of roofline means massive stormwater charges. Landscape irrigation shouldn't be calculated at sewer rates. Your tenants use wildly different amounts—but you're splitting by square footage? Deduct meters and individual metering solve this.

💧 EMWD 💧 Western MWD ⚡ SCE ⚡ Riverside Public Utilities 🔥 SoCalGas
Get Industrial Utility Audit
🏭
500K+
SF Buildings Metered
💧
15-25%
Sewer Savings
📋
NNN
Lease Compliant
TOU
Rate Support

Inland Empire Utility Providers We Work With

Industrial-scale expertise for Riverside and San Bernardino Counties

💧 EMWD (Eastern Municipal Water District)

Water & Sewer

EMWD is the largest water district in the Inland Empire, serving Riverside County. Their tiered rates and sewer calculations significantly impact industrial operating costs.

Tiered Rates Sewer Calculations Industrial Rates

💧 Western Municipal Water District

Water

Serving western Riverside County including Corona, Norco, and Eastvale. Critical for industrial facilities in the logistics corridor.

Industrial Tier Commercial Rates

⚡ Southern California Edison (SCE)

Electric

SCE serves the Inland Empire with industrial rate schedules designed for high-demand facilities. Warehouses with refrigeration or data centers need careful demand management.

TOU-8 Industrial Rates Demand Charges

🔥 SoCalGas

Natural Gas

Southern California Gas serves industrial facilities throughout the Inland Empire. High-volume users benefit from commercial rate optimization.

Industrial Rates High-Volume

💧 Inland Empire Utilities Agency

Water & Wastewater

Regional agency providing wholesale water and wastewater services. Influences local rates across multiple districts.

Wholesale Rates

💧 San Bernardino Municipal Water

Water

Serving the City of San Bernardino and surrounding areas. Industrial users face tiered rates and drought restrictions.

Tiered Rates

⚡💧 Riverside Public Utilities

Municipal Electric & Water

The City of Riverside operates its own electric AND water utility—NOT SCE or a water district. Completely different rate structures. Essential to know for Riverside properties.

Municipal Electric Municipal Water Not SCE

💧 Cucamonga Valley Water District

Water

Serving Rancho Cucamonga, Fontana, and Ontario areas—one of the largest districts in San Bernardino County. Tiered rates with drought restrictions.

Tiered Rates West SB County

💧 Rancho California Water District

Water

Serving Temecula, Murrieta, and surrounding communities. Major water provider for Southwest Riverside County's growing commercial sector.

Tiered Rates Southwest Riverside

Inland Empire-Specific Challenges We Solve

Industrial and logistics facility challenges require specialized solutions

🏭 Massive Stormwater Charges

Warehouses with 500,000+ square foot rooflines face enormous stormwater fees. These charges are often passed through in NNN leases without proper tenant allocation.

✓ Solution: Proper allocation formulas based on actual tenant footprint and usage

🚿 Sewer Charges on Irrigation

Industrial parks pay sewer fees on total water use—including landscape irrigation that never enters the sewer system. This can add thousands monthly.

✓ Solution: Deduct meters separate irrigation water from sewer calculations

How Deduct Metering Saves You Money

Irrigation water never enters the sewer — why pay sewer rates on it?

🚰
Total Water
50,000 gal
🌿
Irrigation Meter
15,000 gal
=
🧾
Sewer Billable
35,000 gal
Without Deduct Meter
$2,850/mo
With Deduct Meter
$1,995/mo
Annual Savings
$10,260/year

📋 NNN Lease Compliance

Triple-net leases require accurate utility pass-throughs. Without proper metering, landlords either absorb costs or face tenant disputes.

✓ Solution: Individual tenant metering with documented billing for NNN compliance

⚡ Industrial Demand Charges

Refrigerated warehouses, data centers, and manufacturing face massive demand charges. One tenant's peak can spike costs for everyone.

✓ Solution: Demand metering identifies which tenants drive peak charges

NNN Lease Utility Pass-Through Example

How proper metering turns a liability into documented cost recovery

500,000 SF Distribution Center - Monthly Breakdown

Master Water Bill (EMWD) $8,450
Master Sewer Charges $6,200
Landscape Irrigation (Deduct Metered) -$2,100
Tenant A (60% of bldg, 45% usage) $5,647
Tenant B (40% of bldg, 55% usage) $6,903
Sewer Savings (Deduct Meter) $2,100/mo

Without metering: Split 60/40 by square footage — doesn't reflect actual usage patterns.

Our Inland Empire Services

Industrial-grade submetering for warehouses, logistics, and manufacturing

🏭 Industrial Submetering

High-capacity electric and water metering for manufacturing and logistics facilities.

🚿 Deduct Metering

Separate irrigation water from sewer calculations—save 15-25% on water/sewer bills.

📋 NNN Billing Compliance

Accurate tenant utility allocation with audit-proof documentation for lease compliance.

⚡ Demand Management

Identify and allocate demand charges to the tenants who cause them.

🔥 Industrial Gas Metering

Commercial gas submetering for manufacturing processes and heating systems.

📊 Utility Cost Analysis

Comprehensive review of EMWD, SCE, and SoCalGas bills to identify savings opportunities.

Is Your Warehouse Paying Sewer on Irrigation Water?

Most industrial properties overpay by thousands each year. Find out how much you could save with deduct metering.

🏭 Inland Empire Industrial Utility Audit

Send us your EMWD or water district bill. We'll analyze your sewer charges and show how deduct metering can better reflect your actual sewer usage.

Request Audit